Project description

When the EDF PEI power plant was built at Le Port, COSYSTEC was asked by Corem to make some fifty cabinets for all buildings (administration, waste collection site, compressors, etc.). We also installed some sixty boxes (site boxes and heavy duty socket boxes) for maximum dissemination of workstations.

Cabinets :  Legrand XL3 800

Protection : DPX 1000

Amperage : 800A

En quelques chiffres